SauleCom splices and certifies fiber for carriers, broadband providers, utilities, and the engineering firms and general contractors who build for them. Crews work from the central office through the distribution network on fiber counts up to 864ct, covering ribbon, single fiber, high count fiber and FTTH.
Every splice is tested and documented — OTDR traces, power meter readings and certification records packaged for acceptance. Crews also resolve what testing exposes: existing network faults, failed test results, discrepancies between design and as-built, and activation issues that only appear at turn-up. Sections are carried through to service readiness rather than handed back at the splice.
Get started
Request a quote
Send drawings, route length and schedule. We come back with a scoped budget and a mobilization date.
Request a quoteHighlights
Central office to distribution splicing, including FTTH
Up to 864ct fiber — ribbon, single and high count
Scheduled night cuts inside fixed maintenance windows
Overnight emergency restoration, crews mobilized off-hours
Design and as-built discrepancies resolved in the field
OTDR and power meter certification carried through to turn-up
Night cuts and emergency restoration
Some fiber work cannot happen in daylight. SauleCom runs scheduled night cuts inside fixed maintenance windows and mobilizes crews overnight for emergency restoration — troubleshooting the fault, performing emergency splicing and returning service before the window closes.
Scheduled night cuts
Planned cutovers executed inside fixed maintenance windows, with network downtime held to the agreed limit.
Overnight emergency response
Crews mobilized outside normal working hours to troubleshoot fiber issues, perform emergency splicing and restore service.
Delivered at scale
Provided across a Kentucky-wide deployment while planned construction and splicing production continued in parallel.
Capabilities
Testing & certification
Step 01
OTDR testing
Step 02
Power meter testing
Step 03
Fiber certification
Step 04
Acceptance testing
Step 05
Network turn-up
Equipment
Equipment schedule — awaiting client